At Staff Electric, we believe that great construction starts long before boots hit the jobsite—it begins in the model. Our virtual design process lays the groundwork for successful prefabrication and seamless field installs. By combining proven standards with real-world awareness, our modeling team helps turn complex projects into efficient, streamlined builds. Here’s how we make it happen:

Consistency

When it comes to modeling, we like to start with a solid foundation. That means using consistent practices, like standard conduit spacing and smart routing, that help speed things up in the shop and make installs smoother out in the field. These standards give us a great head start and let our teams move fast and work efficiently during both design and fabrication.

Flexibility

But we also know that no two jobsites are exactly the same. That’s why we build flexibility into our standards. This way, we can adapt to whatever challenges come our way, whether that’s tight spaces, tricky equipment access, or unexpected sequencing changes.

Balance

Our modeling team focuses on finding the right balance between producing high-quality prefab work and making sure everything fits and functions properly onsite. By tying our digital models closely to real-world install needs, we hit that sweet spot where offsite efficiency works hand-in-hand with onsite practicality. The result is maximum value from prefabrication without sacrificing how things come together in the field.

Contact Us

We want to help you build your future. Connect with us today!